St Georges Centre
I was called in to help with the newly built St Georges Park, the new home of the F.A where the England team will meet up to train and bond before international football games, I was tasked with completing the sealant work in areas such as the Leisure wing which housed the swimming areas and changing rooms where a specialist sealant was required-1025sp. We also sealed all of the tile joints, arc’s, mirrors, ceilings and floors throughout this wing. We sealed the tile joints, arc’s, mirrors, ceilings and floors throughout the other wings that Shannon Sealants Ltd was contracted to do, these wings where the dining wing and the hotel wings at the Hilton and Hampton hotel attached to the complex.
The glass balustrades that surround the Hilton and Hampton balcony’s and the walkways around the elite pitch that the England team train on where also sealed by Shannon Sealants Ltd.
